Turnkey Solution

End-to-end support for confident, successful deployment

Request a Jar Test

Purafloc® provides a complete turnkey service to ensure every customer can deploy liquid activated carbon (patent pending) safely, accurately, and effectively. From laboratory testing through to on-site commissioning, our team offers practical, evidence-based support at every stage of the treatment journey.

A Proven Roadmap For Reliable Treatment Outcomes

Each stage of our turnkey process is designed to reduce operational risk, validate performance, and ensure seamless integration with your existing treatment system.

Stage 1 – Jar Testing

UKAS-Accredited Laboratory Testing


  • Jar tests conducted by engineering team and results validated by UKAS accredited lab
  • Determines the best-suited Purafloc® product for your contaminant profile
  • Optimises traditional coagulation-flocculation chemistry, identifies best dose rate of Purafloc®, and replicates on-site operational settings at small scale
  • Provides an evidence based starting point for pilot trials

Stage 2 – Pilot Studies

Real-World Validation Under Operating Conditions


  • On-site pilot programmes to confirm treatment effectiveness
  • Validates full-scale performance prior to full deployment
  • Allows refinement of dose rates, contact times, and operational settings
  • Reduces risk and ensures regulatory compliance

Stage 3 – Dosing Design Assistance

Optimised Dosing for Accuracy and Efficiency


  • Engineering support to define accurate chemical dosing strategies
  • Tailored to your site’s flow rates, infrastructure, and treatment targets
  • Ensures optimal delivery of Purafloc® products for consistent performance
  • Integrates seamlessly with existing infrastructure

Stage 4 – Installation & Commissioning Support

Technical Guidance for a Smooth Start-Up


  • Assistance throughout installation of dosing equipment and storage tanks
  • Commissioning support to ensure systems operate safely and efficiently
  • Troubleshooting, performance checks, and operator guidance
  • Ensures you achieve immediate, predictable outcomes from day one

Start the Process with a Jar Test

Our turnkey service ensures you have everything you need to deploy Purafloc® with confidence. Speak to our technical team to begin your tailored treatment roadmap.

Request a Sample/Jar Test